Saturday, December 17, 2011

Mars Life Hunt Could Look for Magnetic Clues (SPACE.com)

SAN FRANCISCO ? If life ever existed on Mars, it may have betrayed its presence with a distinctive magnetic signature that a future rover could detect, a new study suggests.

A mission to hunt for life on the Red Planet could look for deposits of magnetite or other iron-bearing minerals in Martian sediment mounds. A relatively even smattering of magnetic grains throughout such mounds would be strong evidence of long-ago capture by sticky microbial "biofilms," the idea goes.

This magnetic method holds promise as a definitive test for Martian life, researchers said. Scientists have been searching for such a black-and-white metric for decades, but most options offer many shades of gray.

"We're trying to get rid of the gray area," said lead author Victoria Petryshyn of the University of Southern California, who presented the study here Friday (Dec. 9) at the annual winter meeting of the American Geophysical Union. [5 Bold Claims of Alien Life]

Sticky microbial mounds

Here on Earth, communities of micro-organisms commonly build large sedimentary mounds called microbialites. The microbes clump together in slimy mats or films, which grow layer by layer as the microbes reproduce, creating microbialites.

The most famous of these mounds are stromatolites, which form in shallow water and preserve a fossil record of life on Earth that stretches back 3.5 billion years.

If a rover stumbled across a stromalite-looking mound on the surface of Mars, scientists would doubtless get very excited. But that discovery would not in itself be definitive evidence of past or present Martian life, since similar mounds can also form without the assistance of living organisms.

Further, microbes don't fossilize well, so the rover might not find anything in a sample even if the mound was once crawling with Red Planet bacteria.

But biofilms are sticky; microbialites trap and bind sediments and various minerals, including magnetite. Petryshyn and her team wanted to see if this magnetite accumulation could serve as a "biosignature," or convincing sign of life. So they performed some experiments.

The researchers harvested microbial mat samples from southern California. They put the samples into a water-filled tank and inclined them at a variety of angles ? from 0 degrees (horizontal) to 90 degrees (vertical). Then they introduced magnetite particles.

They did the same thing with the mat samples swapped out for a carbonate control (microbialites generally contain a lot of carbonate minerals).

The team found that the mat samples trapped much more magnetite than the control. In the control sample, magnetite particles concentrated at the bottom, as dictated by the laws of gravity. But the mat grabbed lots of magnetite across its entire surface, showing just how sticky biofilms are. Even vertically tilted mat samples snagged a lot of magnetite, while the stuff slid right off tilted control samples.

Sampling mounds on Mars?

The team's experiments suggest that a future rover mission could search Martian stromatolite-like mounds for magnetite or other iron-bearing minerals, Petryshyn said. Any mounds that exhibit lots of these minerals throughout their structure ? not just at the bottom ? were likely built by microbes.

To do the job, a rover would just need a small drill and an instrument that induces a magnetic field, a flight-ready version of the table-top device the researchers used for their study.

That shouldn't be too tough, Petryshyn said, pointing out that robot explorers have been outfitted with more-sophisticated gear in the past. For example, NASA's Curiosity rover, which launched toward the Red Planet last month, carries a suite of 10 instruments, including a mass spectrometer.

"If you can put a mass spec on a rover, you can put this on a rover," Petryshyn told SPACE.com.

Of course, the method Petryshyn and her colleagues are proposing would be useful only if rovers spot any suspicious-looking mounds on the Martian surface. That hasn't happened yet. But if it does, researchers would probably want a good way to investigate whether or not it was biological in origin.

"If we found a stromatolite-like structure on Mars, then the fight would begin," Petryshyn said.

You can follow SPACE.com senior writer Mike Wall on Twitter: @michaeldwall. Follow SPACE.com for the latest in space science and exploration news on Twitter @Spacedotcom and on Facebook.

Source: http://us.rd.yahoo.com/dailynews/rss/science/*http%3A//news.yahoo.com/s/space/20111215/sc_space/marslifehuntcouldlookformagneticclues

traffic report traffic report opensky dia frampton dia frampton zook john elway

Friday, December 16, 2011

Leverkusen expects Ballack to leave

Associated Press Sports

updated 11:28 a.m. ET Dec. 15, 2011

LEVERKUSEN, Germany (AP) -Bayer Leverkusen sporting director Rudi Voeller says Michael Ballack will probably leave the club next year.

Voeller told Sky television on Thursday, "At the moment the tendency is for him to only go on (at Leverkusen) until summer."

The 35-year-old Ballack said last month that he did not expect to renew his Leverkusen contract which expires in the offseason.

Ballack indicated he would play for another one of two years "at a high level" elsewhere.

German media has linked the former Germany captain with a move to the MLS.

Leverkusen is in Friday's Champions League draw for the last 16, and is eight points behind Bundesliga leader Bayern Munich.

? 2011 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.


advertisement

More news
Broken leg for Villa

David Villa broke his left leg, marring Barcelona's 4-0 victory over Qatar's Al-Sadd on Thursday night that advanced the European champions to the Club World Cup final against Brazil's Santos.

Reuters
Extending?

Glasgow Rangers have opened talks with Maurice Edu's agent in hope of extending the American midfielder's stay with the defending Scottish Premier League champion.

Source: http://nbcsports.msnbc.com/id/45086317/ns/sports-soccer/

dwight howard louis ck michelle duggar heisman cp3 jeff probst jeff probst

Bombs halve Iraq's Rumaila output; exports normal: officials (Reuters)

BASRA, Iraq (Reuters) ? Output at Iraq's Rumaila oilfield has been halved from about 1.4 million barrels per day after a bombing hit southern pipelines, but crude exports were normal, Iraqi officials said on Wednesday.

Iraq is looking to its vast oil resources for future stability as it emerges from years of war. But renewed attacks on its oil infrastructure are a challenge to Iraqi security forces as U.S. troops withdraw by December 31.

Salah Mohammad, general manager of the Rumaila Operating Organization, told Reuters production from Rumaila oilfield was cut by around 700,000 bpd since Tuesday due to the bombing on the pipelines network.

Total production from Rumaila was at around 1.4 million before the bombing, he said.

"We halted production in Rumaila South because of the explosion. It has been halted until now since yesterday," he said. "The pipeline network was a main one."

Rumaila, the workhorse of Iraq's oil industry, has estimated reserves of around 17 billion barrels and produces the bulk of Iraq's total output of 2.95 million bpd now.

The field is being developed by British oil major BP and Chinese partner CNPC.

Three bombs hit an oil pipeline network that transports crude from southern Iraqi oilfields to storage tanks around the oil hub of Basra, causing a fire that raged all night.

Iraqi officials said the blaze had been put out on Wednesday morning, but an oil police source later said strong winds had reignited the fire.

Iraq's oil exports from Basra will not be affected, an oil ministry spokesman said.

"We have enough storage until we repair these pipelines. We will bypass the oil pumping operations through another pipeline network until repairs are done," spokesman Asim Jihad said.

It will take no more than a week to repair the damage done to the pipelines, he said.

On Wednesday, export flow was at normal rates of 1.68 million bpd from Basra, a shipping source told Reuters. An oil official said Iraq had enough crude stored to keep exports at same levels for two-three days.

The pipeline that was hit was carrying crude to the Zubair 1 storage facility near Basra.

In early June, militants blew up a storage tank at Zubair 1, despite tight security.

OIL SECURITY WORRIES

Basra, which handles most of Iraq's oil exports, has generally seen fewer attacks this year than other cities in the country following an overall decline in levels of violence since the peak of sectarian conflict in Iraq in 2006-07.

In October, two bombs hit pipeline networks transporting crude from Iraq's Rumaila oilfield, the country's biggest, cutting output from the field to 530,000 barrels per day from about 1.24 million bpd.

Iraq's oil police have stepped up patrols to protect installations against a possible surge in al Qaeda attacks as U.S. troops withdraw before December 31, the head of the force said on Tuesday.

An industry source said international oil companies working in the southern oilfields had been asked to reduce production after the attack, but it was not clear if this was a precautionary measure or because of damage to the pipelines.

The companies will look at ways of bypassing the damaged sections of pipeline if necessary, the source said.

(Additional reporting by Rania El Gamal and Ahmed Rasheed in Baghdad; writing by Rania El Gamal; Editing by Alison Birrane)

Source: http://us.rd.yahoo.com/dailynews/rss/energy/*http%3A//news.yahoo.com/s/nm/20111214/wl_nm/us_iraq_oil_exports

pumpkin carving texas tech football bridge school miami dolphins charlie and the chocolate factory ou football ryan torain

Video: Matthews: People want to see the country at its best

South Pole feat remembered, 100 years later

Polar adventurers, scientists and the prime minister of Norway gathered at the bottom of the world Wednesday to mark the 100th anniversary of explorer Roald Amundsen becoming the first to reach the South Pole.

Source: http://www.msnbc.msn.com/id/3036697/vp/45660817#45660817

heritage foundation dancing with the stars results 2011 pecan pie ali fedotowsky ali fedotowsky krill oil krill oil

Friday, December 2, 2011

In Flex We Trust ? (Video) Tech Talk Gaming: Would You Play Video ...

I like gaming but i woud probably prefer to pee in peace. Check out urinal gaming after the jump.


Follow Tat WZA on Twitter/G+

X

@ShottaDru

Bathroom Gaming!!

Urinals aren?t just for advertisements any more, you know. One British pub, The Exhibit, has slapped some urinal games into its lavatory, with the hopes of enticing more male customers. With bathroom video games.

The video above breaks it down in mostly non-gross ways: guy pees and his stream controls the game on-screen. We?re just waiting for the inevitable awkwardness that comes after calling your mates in to watch you ?set a high score.?

Source: http://www.inflexwetrust.com/2011/11/30/video-tech-talk-gaming-would-you-play-video-games-while-you-use-public-restrooms/

eric johnson eric johnson

Monday, November 28, 2011

Willmar, Minn., finance panel to consider 2012 budget, levy Monday ...

WILLMAR ? The Willmar City Council?s Finance Committee will be looking for money next week in the mayor?s proposed 2012 budget for the $23,200 contract for the airport?s fixed-base operator. Funding was inadvertently omitted from the proposed budget.

However, city officials say the contract with Maximum Cruise Aviation to provide certain airport services is important and that funding will probably be taken from another budget area.

Maximum Cruise has a number of airport duties, according to City Administrator Charlene Stevens. The FBO, as it is also known, issues notices about runway conditions and runway closings, monitors and inspects the runway, replaces runway and taxiway lights, shovels snow, mows and trims the grass, and is the on-site contact with pilots and guests.

The FBO sets landing and ground movement traffic patterns, is responsible for routine building maintenance and monitoring systems and has knowledge of the aviation industry. Since the city no longer has a full-time manager at the airport, the fixed-base operator provides an important service for the city, according to Stevens.

She doesn?t know why the contract was not budgeted and said there was no intention of leaving it out, but she recommends it be funded.

Money will have to be found, said Denis Anderson, committee chairman. If that goes in, then something else will have to come out, he said.

The committee will act on the funding dilemma at 5 p.m. Monday in the chambers at the Municipal Utilities Building. In addition, the committee will make a recommendation on the proposed $31,683,222 budget and the proposed $3,992,734 property tax levy.

The budget and levy will be sent to the full council for consideration at the truth in taxation hearing Dec. 5.

The committee has held a number of budget discussions since Mayor Frank Yanish proposed his budget in late August.

Among the discussion items was a request from Let?s Go Fishing of Willmar for $10,000 per year over five years, beginning in 2012. The request didn?t make it in time for the budgeting process, according to Stevens. Anderson says the council could put any amount in there for as long as the council desires.

A couple of items ? railroad quiet zones and storm water improvements ? won?t be funded in 2012, but officials are keeping them in mind for 2013.

Some residents, who are unhappy with train whistles, want the council to establish quiet zones at local railroad crossings.

Others want the city to undertake improvements that will alleviate storm water flooding caused by heavy rain.

Officials acknowledge those issues are important but there?s no money in the 2012 budget and citizens will probably have to wait a year until Yanish, city staff and the council consider the 2013 budget.

Stevens says quiet zones and storm water improvements are on the city?s ?watch list.?? Stevens says the city hasn?t necessarily identified funding because fully scaled projects have not yet been identified.

More than two years ago, former City Public Works Director Mel Odens recommended a quiet zone project at Trott Avenue Southwest be funded in the 2013 street improvement program. Train whistles would not be needed at a quiet zone if gates or medians are installed that prevent traffic from crossing the tracks.

Yanish says the city has been discussing the issue with Burlington Northern Santa Fe Railway?s main office in Houston and with local railroad officials. ?It?s really in the early planning stages,?? he says.

Stevens says there has been much discussion about storm water. She noted a study has been done and recommendations have been received from the Storm Water Task Force.

?It?s an important issue for the community but we have not in the 2012 budget either in the general operating or the capital outlay (budget) identified specific projects and allocated specific funding to them at this time,?? she says.

?But it doesn?t mean that we?ve forgotten these items. It just means they are on the planning horizon and are likely to be items that you see in future capital outlays and planning.??

Another item on the 2013 planning horizon is a quint, which is a combination fire department pumper and ladder truck. The truck, estimated at $640,000, would provide a second elevated master stream to put water on higher buildings and extend the useful life of the current ladder truck, according to Fire Chief Marv Calvin.

Stevens says the 2012 budget is trying to catch up with equipment and vehicle purchases that were delayed when the amount of state aid to local governments was reduced during the past couple of years after budgets and levies had already been set. She said the city accounted for lost revenue by reducing expenses, such as vehicle and equipment replacement.

?In essence you kind of kick the can down the road, maybe try to get a little longer life out of a vehicle or to try to stretch out a project. It eventually does and will catch up with the city,?? Stevens told the council during an Oct. 17 work session.

?We?ll look at that when we start looking forward to the 2013 budget and capital projects and trying to develop more of a comprehensive capital improvement plan over the next five years and showing what our real capital needs are, infrastructure as well as equipment and see how we have deferred some of that,?? Stevens said.

?We?ve allocated some additional dollars to capital outlay to try to catch up and do some additional projects.??

Tags: news,?local,?willmar,?anderson,?stevens,?yanish

Source: http://www.wctrib.com/event/article/id/87064/

black friday violence il postino il postino online black friday deals radio shack ravens nfl scores